Astra Zeneca Avonmouth
Project Outline Turnkey asset recovery, dismantling and traditional and explosive demolition of all above ground structures on the 100-acre former Astra Zeneca / Avara API Pharmaceuticals site.
Project Outline Turnkey asset recovery, dismantling and traditional and explosive demolition of all above ground structures on the 100-acre former Astra Zeneca / Avara API Pharmaceuticals site.
Turnkey dismantling and demolition of former Dragon assembly line comprising recovery of 15 ABB robots for reuse.
Dismantling of redundant ‘Ultimate’ rollercoaster including recovery of structural timber components for reuse.
Turnkey demolition of the 2-acre former Middlesborough Arts College including asbestos removal, soft strip removal, ground slab and foundation removal works including on site concrete and asphalt recycling.
Turnkey demolition of former 18-acre Lubrizol Lubrication / D1 Oils Biodiesel Plant including decontamination of residual products, asbestos removal, soft strip removal and stockpiling brick and concrete arisings for on site recycling.
Dismantling of redundant Polymer Plant in live operational environment including asbestos removal and disposal of residual hazardous materials.
Turnkey dismantling and demolition of 11 hydraulic heavy duty tandem and spotting pressers on the live environment Vauxhall / IBC Vehicles.